Do you still worry about your C_TS420_1709 exam and want to get valid practice questions so that you can master the key knowledge soon? Now we PracticeDump provide you the best C_TS420_1709 exam pdf practice material. Also before purchasing we provide the C_TS420_1709 practice test free for your reference. You can download the practice material free at any time.

As we all know the pass rate of C_TS420_1709 exam is really low, many people have to take exam twice, three times or even more. They spend a lot of money and time on this exam since they do not know about our C_TS420_1709 exam practice material. When they know many people pass exam once by our C_TS420_1709 test engine, they regret it and try to download other subject exams of our C_TS420_1709 practice test free. The practice exam online would help them pass C_TS420_1709 exam at first time and they will consider to purchase practice questions if they take other exams. The C_TS420_1709 is not very difficult with our practice material.
You will also care about our service after you purchase our C_TS420_1709 practice material pdf or practice exam online. Of course we have good customer service so that we can grow up and have good reputation in this area.
Firstly, we are 7*24 online service. No matter when and where you have problems and advice you can contact us, we will try our best to serve for you and reply you ASAP. After purchasing we will provide you one-year service warranty, you can get the latest C_TS420_1709 pdf practice material or practice exam online and contact us at any time.
Secondly, all we sell are the accurate and valid practice material, if you have doubt about C_TS420_1709 practice material pdf or practice exam online please email us. Our IT staff updates information every day. If it is old version we will notice you to wait the update version. We must assure all customers pass exam once by our C_TS420_1709 exam practice material.
Thirdly, we keep your information in secret and safe. After passing exam if you do not want to receive the update version of C_TS420_1709 exam pdf practice material or (SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing (1709)) practice exam online please email us we will not send you any junk emails.
For reasons of space I have missed out some of the details. If you have any doubt please email us I will tell you details. In the end I says again 100% pass, No Help Full Refund.
Instant Download: Our system will send you the PracticeDump C_TS420_1709 practice material file you purchase in mailbox in a minute after payment. (If not received within 12 hours, please contact us. Note: don't forget to check your spam.)
SAP C_TS420_1709 Exam Syllabus Topics:
| Section | Weight | Objectives |
| Topic 1: Material Requirements Planning in SAP ERP | >12% | - Long-term planning and master production scheduling
- Planning strategies
- Lot-sizing procedures
- MRP basics and run steps
|
| Topic 2: Production Orders in SAP ERP | >12% | - Order status management
- Routing selection and order confirmation
- BOM item categories
- Availability check and material staging
|
| Topic 3: Master Data in SAP S/4HANA | 8%-12% | - Material master, BOM, and routing
- Work centers and production versions
- MRP areas and plant parameters
|
| Topic 4: Capacity Planning | 8%-12% | - Capacity evaluation and leveling
- Capacity availability check
- Work center capacity checks
|
| Topic 5: Lean Manufacturing and Kanban | <8% | - Repetitive manufacturing
- Kanban setup and control cycle
|
| Topic 6: Demand Management | 8%-12% | - Planned independent requirements
- Make-to-stock and make-to-order strategies
- Consumption-based planning
|
| Topic 7: Integration with Other Modules | <8% | - Integration with Finance and Controlling
- Integration with Sales and Distribution
|
| Topic 8: Advanced Planning in SAP S/4HANA | >12% | - Detailed scheduling processes
- Advanced planning concepts and master data
- Alert monitor and planning board
|
| Topic 9: Introduction to SAP S/4HANA | 8%-12% | - SAP Fiori UX and embedded analytics
- S/4HANA simplifications and innovations
- SAP HANA database architecture
|
SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing (1709) Sample Questions:
Which functional capabilities does the Detailed Scheduling Board have?
There are 2 correct answers to this question.
Response:
- A. Enter time-ticket confirmation for production orders
- B. Change sales order quantities
- C. Undo for drag & Drop planning activities
- D. Change planned order quantities
Reveal Solution
Discussion
When would you use reporting point backflush in repetitive manufacturing?
There are 2 correct answers to this question.
Response:
- A. When you need to determine the work in progress
- B. You require an up-to-date inventory for components
- C. For production lines with short lead times
- D. When goods issues can wait for final confirmation
Reveal Solution
Discussion
Your customer wants to include restricted-use stock as a potential receipt in the existing ATP check for
component availability.
Which information is required to implement this change request in the scope of check?
There are 2 correct answers to this question.
Response:
- A. The ATP category for restricted-use stock
- B. The checking rule from the business application
- C. The checking group from the material master
- D. The checking control for the order type
Reveal Solution
Discussion
How can you limit the number of master data objects to be created when the manufacturing process is
the same for many different products?
Please choose the correct answer.
Response:
- A. By creating routings with alternative sequences
- B. By creating routings with parallel sequences
- C. By assigning the same production version to different materials
- D. By assigning different materials to the same routing
Reveal Solution
Discussion
A planner updated a production order status from partially confirmed "PCNF" to technically completed
"TECO" by mistake.
What impact would this have to other users for this specific production order?
Please choose the correct answer.
Response:
- A. The buyer can still see component reservations
- B. The production operator cannot enter additional confirmations
- C. The production manager can still see the capacity requirements
- D. The warehouse clerk still carry out goods issue transactions
Reveal Solution
Discussion