NEW QUESTION # 21
Which of the following describes the correct hierarchy of the elements in the Object Repository tree structure?

  • A. Application, Version, Screen, Ul Element.
  • B. Version, Application, Screen, Ul Element.
  • C. Application, Screen, Ul Element, Version.
  • D. Screen, Application, Version, Ul Element.

Answer: C


NEW QUESTION # 22
Which command in the UiPath installation folder configures the UIPath.RemoteDebugging.Agent utility on a Windows robot to accept remote debugging requests from Studio?

  • A. UiPath.RemoteDebuqqinq.Aqent.exe start -port -password -verbose
  • B. UiPath-RemoteDebuqqinq.Aqent.exe enable -port -password -verbose
  • C. UiPath.RemoteDebuqqinq.Aqent.exe enable -port -username -password -verbose
  • D. dotnet ./UiPath.RemoteDebuqqinq.Aqent.dll enable -port -password -verbose

Answer: B


NEW QUESTION # 23
In the Robotic Enterprise (RE) Framework, at which point should a developer log a clear message with the Logging Level set to "Information," adhering to the best practices for automating a production-level process?

  • A. Whenever the robot encounters an error on a Queue Item.
  • B. Whenever an argument or value is used.
  • C. Whenever data is fetched from external sources.
  • D. Whenever an exception is caught in a Catch block.

Answer: C


NEW QUESTION # 24
What is the correct method to check how many resources are utilized in a personal workspace in UiPath Orchestrator?

  • A. Navigate to Tenant > Users, click the Personal Workspaces tab. and then click Resources for the desired workspace.
  • B. Navigate to Tenant > Folders, click the Personal Workspaces tab. and then click See Usage for the desired workspace.
  • C. Navigate to Tenant > Folders, click the All Workspaces tab. and then click Check Resources for the desired workspace.
  • D. Navigate to Tenant > Folders, click the Personal Workspaces tab. and then click Manage Resources for the desired workspace.

Answer: D


NEW QUESTION # 25
What role do Triggers play in the UiPath Integration Service?

  • A. Manage connections between UiPath Studio and third-party applications.
  • B. Provide a mechanism for subscribing to specific events from third-party applications, automatically starting processes in Orchestrator.
  • C. Assist in the creation of automation projects by providing event-based activities.
  • D. Provide a mechanism for starting processes on a scheduled basis from Orchestrator.

Answer: B


NEW QUESTION # 26
Given the following list of arguments:

and the following code:

What is the value that will be displayed in the Output Panel at the end of the sequence below:

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: D


NEW QUESTION # 27
A project built using REFramework pulls phone numbers from a database of employees and creates queue items for each one. Following processing, these elements must be added to a financing application. The queue item holding a phone number becomes invalid if a digit is accidentally left out because of a human mistake. As a requirement, queue items that contain partial numbers should not be accepted.
What type of error should be thrown according to best practices?

  • A. System Exception
  • B. Business Exception
  • C. Application Exception
  • D. Fatal Exception

Answer: B


NEW QUESTION # 28
Considering that the attached table is stored in a variable called "dt":

Which LINQ query can be used to return the maximum total Quantity?

  • A. dt.AsEnumerable. Max(Function(x) Convert.ToInt32(x("Quantity").ToString))("Item")
  • B. dt.AsEnumerable. OrderByDescending(Function(x) Convert.ToInt32(x("Quantity").ToString)). First.Item("Quantity")
  • C. dt.AsEnumerable. Max(Function(x) Convert.ToInt32(x("Quantity").ToString))
  • D. dt.AsEnumerable. GroupBy(Function(x) x("Item").ToString). Max(Function(x) x.Sum(Function(y) Convert.ToInt32(y("Quantity").ToString)))

Answer: D


NEW QUESTION # 29
How would you define a linear process in UiPath?

  • A. The steps of the process refer to the execution of steps in a sequential manner, where each subsequent step depends on the successful completion of the previous step.
  • B. The process steps are performed only once. If the need is to process additional data, then the automation must execute again.
  • C. The steps of the process repeat multiple times over different data items. However, the automation design is such that each repeatable part processes independently.
  • D. The steps of the process are performed multiple times, but each time different data items are used.

Answer: B


NEW QUESTION # 30
What is the purpose of credential stores in UiPath Orchestrator?

  • A. To store non-sensitive data and configuration settings for UiPath Studio projects.
  • B. To serve as a centralized location for storing pre-built automation workflows and processes.
  • C. To store Orchestrator event loos and related data for auditing purposes.
  • D. To securely store sensitive data such as Robot credentials and Credential Assets for use in automation processes.

Answer: D


NEW QUESTION # 31
In order for a developer to utilize the default REFramework without relying on Orchestrator queues, what is the essential prerequisite to ensure that the project does not interact with Orchestrator?

  • A. Exclude the Get Transaction Item activity from the project. Eliminate the three SetTransactionStatus activities from the SetTransactionStatus workflow & change the variable type.
  • B. Eliminate the Get Transaction Data state from the Main state machine. Exclude the Get Transaction Item activity from the project & change the variable type.
  • C. Remove the Get Transaction Data state from the Main state machine. Remove the OrchestratorQueueName setting from Config.xlsx & change the variable type.
  • D. Omit the OrchestratorQueueName setting from the Config.xlsx file. Exclude the three SetTransactionStatus activities from the SetTransactionStatus workflow & change the variable type.

Answer: A


NEW QUESTION # 32
A developer implemented a process using the Robotic Enterprise Framework and an Orchestrator queue. The MaxRetryNumber from the "Config.xlsx" file is set to "1" and the Max # of retries from the Queue settings from Orchestrator is set to "2". At runtime, the first transaction item throws a Business Exception.
How many times will the transaction be retried?

  • A. The transaction will not be retried.
  • B. The transaction will be retried 2 times.
  • C. The transaction will be retried only one time.
  • D. The transaction will be retried multiple times, until it will be processed successfully.

Answer: C


NEW QUESTION # 33
When a developer runs a process using the REFramework, with the process utilizing Orchestrator queues and a queue already created with the Name provided and the Auto Retry function disabled, which states will be executed without errors?

  • A. Initialization -> Get Transaction Data -> Process Transaction -> End Process
  • B. Initialization -> End Process
  • C. Initialization -> Process Transaction -> End Process
  • D. Initialization -> Get Transaction Data -> End Process

Answer: A


NEW QUESTION # 34
A developer wants to create an automation in which the input from the user and pre-defined conditions determine the transition between stages. In UiPath Studio, which is the recommended type of workflow that meets the requirement?

  • A. Workflow
  • B. State Machine
  • C. Global Exception Handler
  • D. Flowchart

Answer: D


NEW QUESTION # 35
What is the default URL of the OCR server that runs the Computer Vision service?

  • A. https://cv.uipath.com/
  • B. https://computervision.uipath.com/
  • C. https://server.uipath.com/
  • D. https://cvserver.uipath.com/

Answer: A


NEW QUESTION # 36
Where in the REFramework template project is the "SetTransactionStatus.xaml" invoked?

  • A. In the Try section of the Try Catch activity in the Process Transaction state.
  • B. In the Try section of the Try Catch activity in the End Process state.
  • C. In the Finally section of the Try Catch activity in the End Process state.
  • D. In the Try and Catches sections of the Try Catch activity in the Process Transaction state.

Answer: D


NEW QUESTION # 37
In a UiPath State Machine workflow, which section of State activity is used to specify conditional/triggers logic and multiple outgoing transitions in a state machine?

  • A. Transitions
  • B. Triggers
  • C. Entry
  • D. Exit

Answer: A


NEW QUESTION # 38
Consider testing a workflow that computes the sum of two numbers having the data driven test data from the Excel file below:

Expanding the functionality of the workflow to compute the sum of three numbers, the data needs to be updated as well to accommodate the new scenario:

What are steps to do that?

  • A. Click Right on the Test Case and select Update Test Data
  • B. Click Right on the Test Case and select Remove Test Data.
  • C. Click Right on the Test Case and select Refresh Test Data
  • D. Click Right on the Test Case and select Add Test Data.

Answer: C


NEW QUESTION # 39
What is the default priority value for the Job Priority field in UiPath Orchestrator when starting a job manually?

  • A. Low
  • B. Inherited
  • C. Medium
  • D. High

Answer: B


NEW QUESTION # 40
In a UiPath REFramework project, what is the primary purpose of using Custom Log Fields?

  • A. To generate extra variables alongside log messages, enhancing workflow understanding.
  • B. To modify the representation of logged contextual data as it is displayed in the Orchestrator.
  • C. To add specific contextual information to log messages that are relevant to the automation process.
  • D. To maintain contextual insights within log messages, including secure details like credentials.

Answer: C


NEW QUESTION # 41
A developer needs to create a repetitive process in the REFramework. Following the best practices, which action(s) should be performed to defend against potential robot crashes such as "out of memory"?

  • A. Build a script that compares current CPU usage values to a threshold and clears data as needed.
  • B. Add a "Clear Collection" activity at the beginning of the Process.xaml workflow.
  • C. After every transaction, clear the transaction data, close the applications, and re-open the applications.
  • D. All "Invoke Workflow File" activities from the Main.xaml file should be marked with the Isolated option.

Answer: D


NEW QUESTION # 42
A developer wants to add items to a list of strings using the Invoke Method activity. The list is declared as follows:

The Invoke Method activity has the following properties:

The Parameters property is as follows:

Based on the information shown in the exhibits what is the outcome of the Invoke Method activity?

  • A. Colors will contain an item with the value "Colors: Yellow".
  • B. Colors will contain an item with an empty value.
  • C. Colors will contain an item with the value "Yellow".
  • D. An exception will be thrown.

Answer: C


NEW QUESTION # 43
......

Updated UiPath-ADPv1 Certification Exam Sample Questions: https://www.practicedump.com/UiPath-ADPv1_actualtests.html

Get Unlimited Access to UiPath-ADPv1 Certification Exam Cert Guide: https://drive.google.com/open?id=1fa07nRl5zAWA2LUfs21h0mInefuif-MP