NEW QUESTION 51
What is the purpose of collective orders?

  • A. To post any component withdrawals single back flush with order confirmation
  • B. To manage production orders for an entire finished product on multiple levels
  • C. To combine order management of co-products and by-products with the main product
  • D. To post production costs on a cost collector instead of the production order

Answer: B

 

NEW QUESTION 52
Which material-specific information can be transferred to a transportation lane in PP/DS?
There are 3 correct answers to this question.
Response:

  • A. Quota arrangements
  • B. Special procurement keys
  • C. Production versions
  • D. Outline agreement
  • E. Purchasing info records

Answer: B,D,E

 

NEW QUESTION 53
Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Work center capacities chart
  • B. Order (pool) chart
  • C. Orders (dispatched) chart
  • D. Capacity requirements chart

Answer: A,D

 

NEW QUESTION 54
In which material master views can you select the batch management checkbox?
There are 2 correct answers to this question.
Response:

  • A. Work Scheduling
  • B. Basic Data 1
  • C. MRP 4
  • D. Purchasing

Answer: A,D

 

NEW QUESTION 55
You run MRP for a material that was planned using Demand-Driven Replenishment. Toward which buffer level does the MRP run create a replenishment proposal?

  • A. Top of Red
  • B. Top of Red Base
  • C. Top of Green
  • D. Top of Yellow

Answer: C

 

NEW QUESTION 56
In which customizing activity do you set up automatic routing selection for production orders?
Please choose the correct answer.
Response:

  • A. Define order-type-dependent parameter
  • B. Define production scheduling profile
  • C. Define selection profiles
  • D. Define scheduling parameters for production orders

Answer: A

 

NEW QUESTION 57
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.

  • A. To make the assignment of components easier
  • B. To simplify the structure of bills of material
  • C. To reduce the number of material masters
  • D. To increase the number of planning levels
  • E. To reduce the number of changes required in bills of material

Answer: A,B,E

 

NEW QUESTION 58
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?

  • A. Forecast planning
  • B. Consumption-based planning
  • C. Material requirements planning
  • D. Manual planning without check

Answer: B

 

NEW QUESTION 59
You want to procure your material components based on a forecast for the finished material derived from historical sales. When customers order, you produce the finished product and reserve it for that particular order.
Which is the appropriate planning strategy to use?
Please choose the correct answer.
Response:

  • A. Make-to-order production (20)
  • B. Planning without final assembly (50)
  • C. Production by lot size (30)
  • D. Planning with final assembly (40)

Answer: B

 

NEW QUESTION 60
What are attributes of the SAP S/4HANA Simplification list?
There are 3 correct answers to this question.
Response:

  • A. It is only a grouping of related technical simplifications
  • B. It was created for better planning and estimation of your way to S/4HANA
  • C. It can have a business and a technical impact
  • D. It details transaction and solution capabilities at a functional level
  • E. It contains references to the relevant training material

Answer: B,C,D

 

NEW QUESTION 61
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. Assign planned orders manual lying the planning table.
  • B. Run MRP with automatic selection of production version.
  • C. Run PP/DS heuristics for repetitive manufacturing.
  • D. Run MRP with quota arrangement.

Answer: C,D

 

NEW QUESTION 62
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. To determine the work in progress along the production line
  • B. To reduce the total production lead time for along production line
  • C. To stage different components for a production line simultaneously
  • D. To provide timely updates of inventory management for the staged components

Answer: A,D

 

NEW QUESTION 63
Which SAP solutions can be used for forecast ng in Supply Chain Planning? Note: There are 2 correct answers to this question.

  • A. Supply Chain Management (SCM)
  • B. Integrated Business Planning (IBP)
  • C. Material Requirements Planning (MRP)
  • D. Capacity Requirements Planning (CRP)

Answer: A,B

 

NEW QUESTION 64
A planner updated a production order status from partially confirmed "PCNF" to technically completed "TECO" by mistake.
What impact would this have to other users for this specific production order?
Please choose the correct answer.
Response:

  • A. The warehouse clerk still carry out goods issue transactions
  • B. The production manager can still see the capacity requirements
  • C. The production operator cannot enter additional confirmations
  • D. The buyer can still see component reservations

Answer: C

 

NEW QUESTION 65
Which master data object governs the relationship between supply source and demand source in the Kanban process?

  • A. Replenishment strategy
  • B. Control cycle
  • C. Production supply area
  • D. Rate routing

Answer: B

 

NEW QUESTION 66
When do you recommend the use of repetitive manufacturing?
There are 2 correct answers to this question.
Response:

  • A. High product complexity
  • B. High product stability
  • C. Low product complexity
  • D. Low product stability

Answer: B,C

 

NEW QUESTION 67
Where can you maintain consumption mode and consumption periods for planning strategies?
There are 2 correct answers to this question.
Response:

  • A. In the requirements class
  • B. In the plant parameters
  • C. In the material master
  • D. In the MRP group

Answer: C,D

 

NEW QUESTION 68
Which of these are layers in SAP Best Practice content?
There are 3 correct answers to this question.
Response:

  • A. Scope items
  • B. Solution packages
  • C. Building blocks
  • D. Process diagrams
  • E. Configuration guides

Answer: A,B,C

 

NEW QUESTION 69
......


SAP C-TS422-1909 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Explain and compare the different production methods in make-to-order
  • Outline the basics and master data of advanced planning
Topic 2
  • Introduction to SAP S/4HANA Supply Chain Planning
  • Material Requirements Planning in SAP S/4HANA
Topic 3
  • Describe the SAP HANA database concept and new user experience with SAP Fiori
  • Identify and explain production relevant master data
Topic 4
  • Outline best practices for using SAP S/4HANA
  • Production Orders in SAP S/4HANA
Topic 5
  • Select and apply planning strategies, use the planning table
  • Advanced Planning in SAP S/4HANA
Topic 6
  • Identify repetitive manufacturing specific master data
  • Apply material staging and confirmation
Topic 7
  • Explain line load planning and confirmation
  • outline the capabilities of embedded analytics
Topic 8
  • Outline both motivation and background of SAP S/4HANA
  • Determine BOM item category
  • Describe order status management and set user statuses
Topic 9
  • Differentiate consumption-based planning vs. MRP, outline new trends in production planning
  • Configure availability check for components
Topic 10
  • Introduction to SAP S/4HANA Production Planning
  • Outline production planning components and functions

 